MIS Completes Infill Drilling - Existing Resource
MISTANGO COMPLETES INFILL DRILLING PROGRAM AIMED AT UPGRADING EXISTING RESOURCE
Kirkland Lake, Mistango River Resources Inc. (MIS : CNSX) (GLRAF : OTC) today announced the latest results of the last two deep down plunge extension holes drilled on the Omega Deposit and five infill holes in the potential open pit area. The five infill holes are part of the already completed ( pending partial assays) 14 DDH, planned by AMC Mining Consultants in order to upgrade the existing potential open pit resource of 3.8 million tonnes, containing 306,100 Oz Au at 2.5 g/t Au, into the indicated category. The total inferred resource of the potential open pit and the down dip extension below contains 5 million tonnes, totaling 472,100 ounces of gold.
Drilling Highlights
- OM-13-107 3.495 g/t gold over 32 metres (including 2 metres of 17.225 g/t gold)
- OM-13-109 1.763 g/t gold over 57 metres (including 19 metres of 2.656 g/t gold and 5 m of 3.522 g/t gold)
Read more: MIS Completes Infill Drilling - Existing Resource


Please wait...